国产精品精品国产一区二区,久久久之久亚州精品露出,国产精品久久国产亚洲av,99国产精品99久久久久久

當(dāng)前位置:首頁-新聞資訊

鋁卷與外墻保溫板組合的施工結(jié)構(gòu)

來源:http://m.ijizz.cn/ 發(fā)布時間:2022-06-23

傳統(tǒng)的外墻保溫施工方法有穿墻螺釘和木方格。絕緣板上開穿墻螺絲孔,容易損壞鋁卷,后期需要堵塞,大大增加了施工成本;加固施工是通過螺釘、木方格和背面波紋的組合進(jìn)行的。施工過程繁瑣。在墻體中間放置一根水泥支撐桿,以保證墻體的橫截面尺寸。熟練度調(diào)整,施工難度越大,質(zhì)量越難保證。
The traditional construction methods of exterior wall insulation include through wall screws and wood checkers. The through wall screw holes are opened on the insulating plate, which is easy to damage the aluminum coil and need to be blocked later, which greatly increases the construction cost; The reinforcement construction is carried out through the combination of screws, wood squares and back corrugations. The construction process is tedious. A cement support rod is placed in the middle of the wall to ensure the cross-sectional dimension of the wall. The more difficult the construction is, the more difficult it is to ensure the quality.
在冬季,外墻保溫裝置一般包括外墻模板、外墻模板一側(cè)的保溫板和多個緊固裝置。外墻模板包括一模板主體,模板主體平行于保溫板,并從模板主體向遠(yuǎn)離保溫板的方向延伸,多個側(cè)面板。但外墻保溫板在使用中存在缺陷。一是保溫板之間的連接不緊密,二是外保溫板不易更換。為了解決這個問題,現(xiàn)在采用鋁卷和外墻保溫板相結(jié)合的保溫方法。
In winter, the external wall insulation device generally includes the external wall formwork, the insulation board on one side of the external wall formwork and multiple fastening devices. The external wall formwork comprises a formwork main body, which is parallel to the insulation board and extends from the formwork main body to the direction away from the insulation board, and a plurality of side panels. However, there are defects in the use of external wall insulation board. Firstly, the connection between insulation boards is not tight, and secondly, the external insulation board is not easy to replace. In order to solve this problem, the insulation method of combining aluminum coil and external wall insulation board is adopted.
鋁卷與外墻保溫板組合的施工結(jié)構(gòu)主要包括保溫板、鋼筋混凝土現(xiàn)澆結(jié)構(gòu)、鋁模內(nèi)墻板、方管夾具、方管背面、一次性拉片。鋼筋混凝土現(xiàn)澆結(jié)構(gòu)的內(nèi)側(cè)和外側(cè)分別設(shè)有鋁模內(nèi)墻板和保溫板,保溫板外側(cè)還設(shè)有固定保溫板的鋼架。
The construction structure of the combination of aluminum coil and external wall insulation board mainly includes insulation board, reinforced concrete cast-in-place structure, aluminum mold inner wall board, square tube clamp, square tube back, and one-time pull sheet. The inner side and outer side of the reinforced concrete cast-in-place structure are respectively provided with aluminum formwork inner wall plate and insulation board, and the outer side of the insulation board is also provided with a steel frame for fixing the insulation board.

鋁卷生產(chǎn)廠家
將板材固定在鋼架上,一次性拉片的兩端與方管夾連接,使方管夾相互拉動時,鋁卷與鋁模內(nèi)壁面板鎖定在鋼筋混凝土現(xiàn)澆結(jié)構(gòu)的兩側(cè)。鋁模內(nèi)墻板上方設(shè)有垂直樓板模板,樓板模板與鋁模內(nèi)墻板通過樓板角槽連接;鋁模內(nèi)墻板的底部也鉸接有墻板撐桿,墻板撐桿的另一端固定在地面上;保溫板的高度超過其所在樓層的高度50mm。
Fix the plate on the steel frame, and connect the two ends of the disposable pull sheet with the square pipe clamp, so that when the square pipe clamp is pulled mutually, the aluminum coil and the inner wall panel of the aluminum mold are locked on both sides of the reinforced concrete cast-in-place structure. A vertical floor formwork is set above the inner wall panel of the aluminum mold, and the floor formwork is connected with the inner wall panel of the aluminum mold through the floor corner groove; The bottom of the inner wall panel of the aluminum mold is also hinged with a wall panel brace, and the other end of the wall panel brace is fixed on the ground; The height of the insulation board shall be 50mm higher than the height of the floor where it is located.
鋁卷生產(chǎn)廠家認(rèn)為雙拉結(jié)構(gòu)可以實(shí)現(xiàn)鋁卷的鎖緊,安裝更方便,對工人施工經(jīng)驗(yàn)的依賴很低。一次性雙拉片根據(jù)壁厚定制,不需要水泥支撐條,減少了工藝和成本。施工完成后,上下敲擊即可拆除,不留大孔,無需后期封堵作業(yè)。
The aluminum coil manufacturer believes that the double pull structure can realize the locking of aluminum coil, which is more convenient for installation and has low dependence on the construction experience of workers. The disposable double pull tab is customized according to the wall thickness, and no cement support strip is required, which reduces the process and cost. After the construction is completed, it can be removed by knocking up and down without leaving large holes, and there is no need for later plugging operation.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://m.ijizz.cn并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://m.ijizz.cn And consult our staff, will serve you wholeheartedly.

火辣美女的操大逼| 欧美大胆a级视频 一本| 成人高清在线播放一区二区三区| 欧美精品一区二区三区四区五区| 久久69精品久久久久免| 想被操在线啊啊啊啊| 黑人大屌爆操骚货| 性色av少妇一区二区三区多人| 日本不卡免费一区二区视频| 国产无码福利一区| 视频一区视频二区制服丝袜| 国产品无码一区二区三区在线| 日韩久久奶茶视频| 国产日韩精品v一区二区| 国产又粗又猛又色又免费| 精品久久久久久久人妻换| 亚洲国产成久久成人综合一区| 国产精品亚洲一区二区三区下载| 国产午夜福利片无码视频| 男人和女人干污污| 日韩无码av三级片| 欧美 日韩 亚洲 熟女| 大肌巴日小个子女人视频| 无码人妻精品一区二区三区蜜桃| 国产欧美洲中文字幕床上| av中文字幕一区二区精品久久| 三级片成人京东热五月天| 久久久国产了楼凤| 韩国年轻的母亲在线观看| 日韩伦理视频一区二区三区| 天堂丝袜人妻中文字幕在线| 天堂久久久久久久久久久| 欧美日韩精品视频在线第一区| 亚洲国产综合精品 在线 一区| 美女骚逼被操出白浆| 爆乳1把你榨干在线观看| 黑人巨茎和中国美女视频| 女生小穴色色视频| 9999热精品免费视频| 爱爰哦好粗好猛操b视频| 欧美日韩一区精品一区精品|